A Professional Specialized Skill Training Program by Indian Arbitration Institution (IAI)
Eligibility: Any Basic Qualification or any Formal Education with Masters / Post Graduate Diploma appearing or passed.
Total Fees: Rs. 8,500/-
(Everything Included from Admission, Course Fees and Delivery of Certificate, no additional Fees Apart from it)
Mode: Online
Study Material:Â Will be provided through Learning Dashboard/Portal
Learning Type: Self Paced
Duration:Â 3 Months (Preferably, but can be completed anytime as soon as you give the Exam)
Enrollment:Â Any Time, there is no Fixed Enrolment Date or Day. A candidate can choose any time and the enrolment will be processed real time.
Exam: One Online Exam, MCQ and Subjective Type Questions of 100 Marks. Passing Marks 40%. If unsuccessful, you can give additional two attempts.
Procedure: Fill the Apply Now Form → Pay the Requisite Amount of Fees by Clicking Pay Now Button → Then Click on Payment Confirmation button and fill the form with all the Details → Then login to the Dashboard.
In capital-intensive infrastructure, engineering, and construction projects, project schedule disruption represents the primary trigger for high-stakes dispute resolution. Managing project delays requires a specialized synthesis of engineering methodologies, critical path scheduling, contractual risk allocation, and evidentiary legal substantiation. The Pre-Doctoral Research in Delay & Extension of Time (PDRDET), administered by the Indian Arbitration Institution (IAI), is an advanced, research-oriented training program created to develop high-level investigative and forensic capabilities in delay quantification, schedule analysis, and contractual extension of time (EOT) claims.
The program bridges the gap between academic research methodology and practical arbitration practice. Candidates explore the analytical doctrines that underpin delay allocation under standard contract forms, including FIDIC, NEC, JCT, and standard public sector EPC frameworks. Rather than treating delay as a purely operational or administrative challenge, the PDRDET curriculum guides learners through rigorous research methodologies necessary to substantiate causal linkage between root disruptions, delayed critical path activities, and compensatory relief.
Participants engage with sophisticated forensic scheduling methods, comparing prospective methods like Impacted As-Planned and Time Impact Analysis with retrospective techniques such as As-Planned vs. As-Built and Collapsed As-Built (Time Slice / Windows Analysis). The coursework systematically addresses concurrent delay theories, float ownership disputes, pacing delays, and the apportionment of prolongation costs under complex international protocols, specifically the Society of Construction Law (SCL) Delay and Disruption Protocol and AACE International Recommended Practices.
Through deep analytical modules, literature synthesis, and forensic case studies, scholars evaluate how tribunals scrutinize critical path schedules, baseline updates, and contemporary records. Designed for professionals preparing for doctoral dissertations, published research, expert witness appointments, or high-tier arbitral advocacy, the PDRDET equips candidates with the research rigor and practical precision demanded in multi-million-dollar construction claims and transnational arbitration tribunals.
The tentative modules are as follows and are updated continuously under the academic supervision of the IAI Research Council:
Module 1: Foundations of Delay Research & Contractual Time Frameworks
Theoretical paradigms of time obligations: "Time of the Essence," reasonable time, and time at large.
Contractual risk matrices governing extensions of time across FIDIC (Red, Yellow, Silver Books), NEC4, and EPC models.
Notice provisions, conditions precedent, and legal doctrines governing the forfeiture of delay entitlements.
Module 2: Critical Path Method (CPM) and Baseline Scheduling Dynamics
Principles of CPM networks: logical dependencies, leads, lags, constraints, and scheduling sanity checks.
Baseline validation, monthly status updates, work breakdown structures, and schedule revision integrity.
Float allocation, total float depletion, shared float theories, and project float ownership disputes.
Module 3: Methodologies of Forensic Delay Analysis
Comparative study of additive vs. subtractive and prospective vs. retrospective delay analysis methodologies.
Implementation of As-Planned vs. As-Built, Impacted As-Planned, and Collapsed As-Built (But-For) methods.
Time Impact Analysis (TIA) and Window Analysis under SCL and AACE International protocols.
Module 4: Concurrent Delay, Pacing, and Causal Attribution
Doctrinal analysis of concurrent delay: dominant cause, "but-for" causation, and Malmaison principles.
Employer risk events vs. Contractor risk events occurring within identical delay windows.
Voluntary and involuntary pacing delay: evidentiary burdens, contractor intent, and tribunal scrutiny.
Module 5: Extension of Time (EOT) Claim Formulation and Substantiation
Establishing cause-and-effect nexus: translating project logs and site diaries into forensic proof.
Drafting substantiation narratives: executive claim architecture, fragnet modeling, and milestone mapping.
Responding to and rebutting EOT claims on behalf of employers, engineers, and contract administrators.
Module 6: Financial Consequences of Delay and Prolongation Costing
Distinction between delay, disruption, and acceleration claims in construction economics.
Quantification of site overheads, head office overhead formulas (Hudson, Emden, Eichleay), and idle plant costs.
Finance charges, inflation adjustments, lost opportunity costs, and liquidated damages interplay.
Module 7: Expert Witness Practice, Evidentiary Burdens, and Tribunal Scrutiny
The role, ethical duties, and procedural independence of the independent delay expert witness.
Preparing CPR Part 35 / IBA Rule-compliant expert reports on delay and schedule disruption.
Hot-tubbing, concurrent evidence hearings, and withstand-cross-examination techniques in arbitration.
Module 8: Pre-Doctoral Research Methodologies in Construction Dispute Resolution
Formulating research questions and literature reviews in delay, disruption, and claims governance.
Qualitative and quantitative data collection: archival analysis of arbitral awards and project data.
Structuring research proposals, methodology design, and thesis outlines for doctoral admissions and publications.
In modern infrastructure disputes, claims for Extension of Time and associated prolongation damages represent the largest financial components in arbitration. However, tribunals frequently reject delay claims due to flawed methodologies, subjective narratives, or an inability to legally substantiate critical path impact. The PDRDET program provides practitioners with the specialized technical and research competency required to eliminate these recurring pitfalls.
First, the program builds advanced mastery in delay quantification protocols. Participants move beyond surface-level scheduling into the empirical mechanics of SCL Protocols and AACE Recommended Practices. This technical foundation enables practitioners to select and defend the precise delay methodology best suited to the available project records and tribunal expectations.
Second, the course serves as a critical academic and research bridge for candidates seeking doctoral (Ph.D., SJD, or DBA) degrees in construction law, project management, or commercial arbitration. It equips scholars with formal literature review techniques, hypothesis structuring, and data analysis models focused specifically on dispute resolution and contract administration.
Third, the PDRDET credential provides an authoritative differentiator for forensic practitioners and arbitration specialists. Awarded by the Indian Arbitration Institution, this certification demonstrates specialized expertise to law firms, dispute adjudication boards, and multinational employers. It confirms that the holder possesses the forensic analytical skills necessary to evaluate project schedules, identify genuine causal links, and produce robust, tribunal-ready delay evaluations.
The Pre-Doctoral Research in Delay & Extension of Time (PDRDET) qualification positions professionals for specialized and senior advisory appointments within the global construction claims and dispute management sectors.
Forensic Delay and Scheduling Analysts: Graduates can serve in specialized dispute consultancies and advisory practices, analyzing complex project schedules, building as-built fragnet models, and developing objective delay assessments for arbitration and court litigation.
Independent Delay Expert Witnesses: Seasoned practitioners with professional backgrounds in engineering, architecture, or surveying can leverage this credential to accept formal appointments as independent delay experts. They produce expert reports on delay attribution and provide expert testimony before arbitral tribunals.
Contract Administrators and Commercial Managers: EPC contractors, engineering firms, and project developers require commercial directors who understand how to preserve time claims on active job sites. Credentialed professionals manage contemporary records, draft time extension notices, and evaluate employer-imposed liquidated damages.
Construction Dispute Lawyers and In-House Legal Counsel: Attorneys representing clients in international construction disputes gain the technical literacy needed to cross-examine technical scheduling experts, evaluate opposing delay reports, and formulate persuasive pleadings around critical path disruption.
Doctoral Researchers and Academic Fellows: The program provides an empirical foundation for professionals seeking entry into doctoral programs or think tanks, preparing them to publish academic papers on construction law, public procurement disputes, and project governance.
The Indian Arbitration Institution delivers the PDRDET program through a flexible online model engineered to support practicing engineers, lawyers, project managers, and postgraduate researchers.
Eligibility To ensure research capability and analytical rigor, enrollment is open to:
Any Basic Qualification or any Formal Education with a Master's degree or Post Graduate Diploma (appearing or passed).
This framework welcomes graduates and final-year postgraduate students across law, engineering, construction management, project planning, architecture, commerce, and related technical disciplines.
Total Fees The all-inclusive fee for the program is Rs. 8,500/-. The IAI maintains a single transparent fee structure. This one-time payment covers admission, complete digital study materials, examination access, grading, and the final physical certificate delivered via courier to the candidate's postal address. There are no additional or hidden fees.
Mode and Study Material The program is administered completely Online. Enrolled scholars receive personalized access credentials to the IAI Learning Dashboard/Portal. Complete Study Material—including delay analysis manuals, research guides, international delay protocols, case compendiums, and forensic calculation frameworks—is accessible directly through the dashboard.
Learning Type and Duration The program operates as a Self-Paced learning module. The recommended timeline for coursework completion and research engagement is 3 Months; however, participants have full autonomy to accelerate their study and appear for the final assessment as soon as they complete their preparations.
Enrollment Admissions remain open Any Time throughout the calendar year with no rigid term dates or intake cutoffs. Registration is processed in real time, granting immediate portal and study material access upon payment verification.
Examination Structure Certification requires the completion of One Online Exam carrying a total of 100 Marks, comprising both Multiple Choice Questions (MCQs) and Subjective Analytical Questions.
Passing Marks: 40%
Re-examination Policy: Candidates who do not achieve the qualifying mark on their initial attempt are entitled to two additional attempts at no additional charge.
Application Procedure
Apply: Complete and submit the online Apply Now Form on the IAI portal.
Pay: Pay the program fee of Rs. 8,500/- using the Pay Now button.
Confirm: Select the Payment Confirmation button and fill in the form with the transaction details.
Dashboard Access: Log in to the Student Learning Dashboard to access the research modules and begin studying.