A Professional Specialized Skill Training Program by Indian Arbitration Institution (IAI)
Eligibility: Any Basic Qualification or any Formal Education with Diploma or Graduation appearing or passed.
Total Fees: Rs. 7,500/-
(Everything Included from Admission, Course Fees and Delivery of Certificate, no additional Fees Apart from it)
Mode: Online
Study Material:Â Will be provided through Learning Dashboard/Portal
Learning Type: Self Paced
Duration:Â 3 Months (Preferably, but can be completed anytime as soon as you give the Exam)
Enrollment:Â Any Time, there is no Fixed Enrolment Date or Day. A candidate can choose any time and the enrolment will be processed real time.
Exam: One Online Exam, MCQ and Subjective Type Questions of 100 Marks. Passing Marks 40%. If unsuccessful, you can give additional two attempts.
Procedure: Fill the Apply Now Form → Pay the Requisite Amount of Fees by Clicking Pay Now Button → Then Click on Payment Confirmation button and fill the form with all the Details → Then login to the Dashboard.
The engineering, procurement, and construction (EPC) and infrastructure sectors operate under aggressive schedules, complex contractual matrices, and unpredictable site conditions. Delays are almost inevitable, and unresolved schedule disruptions represent the primary trigger for multi-million-dollar disputes, project cost overruns, and arbitral references. When project timelines slip, contractors face crippling liquidated damages, while employers face extended financing costs and delayed asset commercialization. The Post Graduate Diploma in Extension of Time Claims (PGDETC), offered by the Indian Arbitration Institution (IAI), delivers a specialized, rigorous curriculum designed to master the procedural, technical, and legal dimensions of delay analysis, extension of time (EOT) claim formulation, and time-at-large disputes.
This program bridges the critical gap between technical scheduling practices and legal dispute mechanics. Participants study how project timelines become compromised, examining delays caused by delayed site handover, design variations, force majeure events, utility encumbrances, and owner-directed scope alterations. The coursework breaks down standard international and domestic contract conditions—including FIDIC (Red, Yellow, and Silver Books), NEC, EPC turnkey frameworks, and standard public works formats—to unpack exact notice obligations, time-bar provisions, and employer determination mechanics.
Crucially, the PGDETC focuses on globally recognized forensic schedule analysis methodologies. Candidates analyze the principles set out by the Society of Construction Law (SCL) Delay and Disruption Protocol and the Association for the Advancement of Cost Engineering (AACE) International Recommended Practices. The training covers retrospective and prospective delay techniques, including Impacted As-Planned, Time Impact Analysis (TIA), As-Planned vs. As-Built, and Collapsed As-Built methods. In addition to technical scheduling, learners examine the legal prerequisites for proving entitlement, linking cause to effect, managing concurrent delays, and substantiating prolongations costs such as unabsorbed head-office overheads, idle equipment, and extended financing expenses.
Structured for contract administrators, project engineers, quantity surveyors, and legal counsels, PGDETC translates real-world engineering project data into legally defensible EOT claims and rebuttal responses. By synthesizing critical path method (CPM) scheduling with robust contractual argumentation, this diploma equips professionals to preserve project cash flows, protect against delay liquidated damages, and secure successful determinations in dispute boards and arbitral tribunals.
The tentative modules are as follows and are subject to continuous updates based on guidelines issued by the IAI Board of Skill Studies:
Module 1: Contractual Frameworks, Time Provisions, and Notice Architecture
Time as the essence of contract: contractual completion dates, sectional milestones, and keys to handover.
Provisions governing Extension of Time under FIDIC, NEC, CPWD, NHAI, and customized EPC contracts.
Mandatory condition precedent notices, time-bar clauses, waiver, and prevention principles.
Module 2: Critical Path Method (CPM) and Baseline Scheduling Integrity
Fundamentals of Critical Path Method (CPM) scheduling in Primavera P6 and Microsoft Project.
Baseline schedule validation, logic link integrity, activity constraints, and float ownership.
Progress update methodologies, as-built records, contemporaneous correspondence, and site log tracking.
Module 3: Delay Categorization and Forensic Schedule Analysis Methodologies
Classification of delays: excusable vs. non-excusable, compensable vs. non-compensable.
Doctrines of concurrent delay, pacing delays, and dominant cause analysis.
Application of SCL Protocol and AACE International practices: Time Impact Analysis (TIA), Windows Analysis, As-Planned vs. As-Built, and Collapsed As-Built.
Module 4: Substantiating and Formulating Defensible EOT Claims
Establishing legal causation: connecting factual events to critical path movement (cause-and-effect matrix).
Structure and drafting of comprehensive EOT claim narratives and evidence bundles.
Employer and Engineer perspectives: evaluating, assessing, and rebutting non-meritorious contractor claims.
Module 5: Prolongation Costs, Disruption, and Financial Compensation
Principles of delay damages: site overheads, head office overhead formulas (Hudson, Emden, Eichleay).
Plant and machinery idling costs, labor productivity loss (measured mile analysis), and escalation claims.
Distinction between delay (time-related costs) and disruption (productivity losses).
Module 6: EOT Claims in Dispute Boards, Arbitration, and Litigation
Presenting delay claims before Dispute Avoidance/Adjudication Boards (DAAB) and independent engineers.
Role of independent delay experts in domestic and international arbitration.
Preparation of expert witness reports, joint statements, witness cross-examination, and tribunal determinations.
In modern capital-intensive construction and infrastructure projects, schedule delays directly translate into financial exposure. A contractor failing to submit a contractually compliant Extension of Time claim risks facing delay liquidated damages, contract termination, and heavy performance bond encashment. Conversely, an employer or project owner who improperly rejects a valid EOT claim risks setting time at large, forfeiting the right to enforce liquidated damages, and facing steep interest liabilities on prolonged claims.
Enrolling in the PGDETC provides an immediate competitive and operational advantage:
First, it eliminates technical vulnerabilities in claim administration. Many otherwise legitimate claims fail simply because of procedural lapses, missed notice windows, or inability to demonstrate that an event actually delayed the project's critical path. This course provides participants with clear methodologies to identify, isolate, and prove critical delay, satisfying both technical and legal standards of proof.
Second, the curriculum bridges the persistent professional divide between planning engineers and legal professionals. Planners often understand software output but struggle to draft persuasive legal narratives that withstand judicial scrutiny. Lawyers understand the governing contractual clauses but frequently struggle to interrogate CPM baseline schedules and logic link revisions. The PGDETC unites these two critical disciplines, creating well-rounded professionals who can navigate both Primavera project schedules and statutory arbitration proceedings.
Third, this specialized diploma signals verified competence in an area where standard degrees fall short. General civil engineering and traditional law curricula rarely cover forensic delay modeling or the practical application of SCL Protocols. Achieving the PGDETC from the Indian Arbitration Institution confirms that the professional holds specialized skills capable of defending project revenue, mitigating risk, and resolving delay claims before disputes escalate into protracted litigation.
Graduates of the PGDETC program are positioned for high-impact, specialized roles across engineering conglomerates, project management consultancies, public sector undertakings, and dispute resolution advisory firms.
Forensic Delay and Scheduling Analysts: Specialized delay analysts are employed by top global claims consultancies to conduct retrospective schedule interrogations for multi-million-dollar disputes. They build dynamic models to demonstrate exact day-for-day critical path slippage in formal proceedings.
Contract and Commercial Managers in EPC Firms: Contract administrators and commercial managers in construction and infrastructure companies rely on this credential to safeguard project margins. They oversee contractual notices, interface with project directors to monitor emerging delays, draft robust EOT claims, and protect companies against unjust liquidated damages deductions.
Project Managers and Resident Engineers: Engineers representing government departments, public authorities, concessionaires, and private project owners must evaluate contractor submissions objectively. Armed with this diploma, they accurately determine legitimate time extensions, reject inflated claims, and adjust completion milestones with minimal dispute risk.
Independent Delay Experts and Arbitral Consultants: Experienced practitioners can serve as independent party-appointed or tribunal-appointed delay expert witnesses. They prepare authoritative forensic delay reports and deliver sworn testimony before arbitral tribunals, high court benches, and commercial mediation panels.
Dispute Resolution and Construction Law Advocates: Lawyers handling infrastructure arbitration require specialized technical literacy to cross-examine planning experts, construct persuasive claim narratives, and argue delay-related disputes effectively. This diploma provides the precise scheduling vocabulary and methodologies required to dominate commercial arbitration proceedings.
The Indian Arbitration Institution offers this industry-focused postgraduate diploma through a flexible, fully digital model designed for working professionals and aspiring candidates across the country.
Eligibility The program is accessible to professionals and learners at various stages of their careers:
Any Basic Qualification or any Formal Education with a Diploma or Graduation (candidates either appearing for their final exams or already passed are eligible to apply).
This inclusive criterion enables civil engineers, mechanical engineers, architects, project planners, law students, advocates, quantity surveyors, and project managers to acquire specialized dispute-management credentials.
Total Fees The all-inclusive fee for the program is Rs. 7,500/-. This represents a single, complete investment with zero hidden costs. It covers registration, admission processing, full curriculum access, examination fees, and the physical printing and courier delivery of the final Diploma Certificate upon successful completion.
Mode and Study Material The program is conducted 100% Online. Enrolled students receive secure access credentials to the dedicated Learning Dashboard/Portal. Complete Study Material—including instructional modules, practical delay case studies, delay analysis templates, standard contract comparison charts, and reference guides—is provided directly through the portal for digital study.
Learning Type and Duration The program operates as a Self-Paced learning course. While the recommended duration is 3 Months, candidates are not bound by rigid semester schedules. Learners have the freedom to progress at their own speed and can appear for the final assessment as soon as they complete their study.
Enrollment Candidates can enroll at Any Time. The institution maintains no fixed calendar dates, seasonal batches, or enrollment cutoffs. Applications are processed in real time, granting immediate entry to the dashboard upon confirmation.
Examination Structure Evaluation consists of One Online Exam comprising Multiple Choice Questions (MCQs) and Subjective Type Questions carrying a total of 100 Marks.
Passing Marks: 40%
Re-examination Policy: If a candidate is unsuccessful on the first attempt, they are entitled to two additional attempts at no additional fee.
Procedure
Apply: Complete the Apply Now Form on the official portal.
Pay: Pay the requisite course fee of Rs. 7,500/- by clicking the Pay Now button.
Confirm: Click the Payment Confirmation button and complete the submission form with your transaction details.
Access: Log in to the Learning Dashboard to start accessing your course modules immediately.